Internal plaster = room perimeters × height − openings − tiled skirting − dado tiling. 120 m of room perimeter at 3 m is 360 m²; less 40 m² of openings, 10 m² of skirting and 42 m² of kitchen and bathroom tiling, 268 m² remains: 16.8 bags of cement at 12 mm, 1:6.
Free Account Required
Sign up free with your email or Google to use this calculator. It takes under a minute and unlocks every calculator on the site.
Less openings 40.0 m², skirting 10.0 m², dado tiling 42.0 m²
Net = 268.0 m² × 12 mm = 3.216 m³ wet → cement 16.80 bags
Scan to open this calculationThe code links to this calculator with your inputs, so anyone can scan it with a phone camera and see the same result. Save it for a report, a site board or WhatsApp.Test copy: this code opens the live site, myconstructioncalculator.com, so it works on a phone once the site is launched.
Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.
Commonly 1:6 (or 1:5) cement-sand, 12 mm thick on brick or block. It is leaner than external plaster because it is not exposed to rain.
Should I deduct tiled areas from plaster?
If tiles are fixed directly to the blockwork or on a separate backing coat, deduct them. Many specifications still plaster behind wall tiles as a flat base (then don)'t.
How do I measure room perimeters?
Add the inside lengths of all walls in each room. A 4 × 3 m room has a 14 m perimeter.