CONCRETE CURING & POUR PLANNING · FIELD TOOL

Concrete Temperature Log Generator

Log concrete temperature often in the first 72 hours, when cement heat peaks, then less often. For a 250 mm slab poured at 14:00, readings every 4 hours for 3 days and every 12 hours after give 27 readings over a week. ACI 306 asks for at least 13 °C (55 °F) in sections under 300 mm.

Free Account Required

Sign up free with your email or Google to use this calculator. It takes under a minute and unlocks every calculator on the site.

Behind this panel: an example with the default sizes.

Inputs

Results update as you type.

Pour
m
Reading plan
Reading times27 readings over 7 daysevery 4 hthen every 12 h0 h72 h168 hmyconstructioncalculator.com
Diagram updates as you type.

Results

Check the working before you order.

Readings in the log
27over 7 days
Keep concrete at or above (ACI 306)13 °C for the protection period
Placing temperature limit (hot weather)35 °C common specification limit
Reading 1: Mon, 2 Nov 2026 14:00_____ °C (+0 h)
Reading 2: Mon, 2 Nov 2026 18:00_____ °C (+4 h)
Reading 3: Mon, 2 Nov 2026 22:00_____ °C (+8 h)
Reading 4: Tue, 3 Nov 2026 02:00_____ °C (+12 h)
Reading 5: Tue, 3 Nov 2026 06:00_____ °C (+16 h)
Reading 6: Tue, 3 Nov 2026 10:00_____ °C (+20 h)
Reading 7: Tue, 3 Nov 2026 14:00_____ °C (+24 h)
Reading 8: Tue, 3 Nov 2026 18:00_____ °C (+28 h)
Reading 9: Tue, 3 Nov 2026 22:00_____ °C (+32 h)
Reading 10: Wed, 4 Nov 2026 02:00_____ °C (+36 h)
Reading 11: Wed, 4 Nov 2026 06:00_____ °C (+40 h)
Reading 12: Wed, 4 Nov 2026 10:00_____ °C (+44 h)
Reading 13: Wed, 4 Nov 2026 14:00_____ °C (+48 h)
Reading 14: Wed, 4 Nov 2026 18:00_____ °C (+52 h)
Reading 15: Wed, 4 Nov 2026 22:00_____ °C (+56 h)
Reading 16: Thu, 5 Nov 2026 02:00_____ °C (+60 h)
Reading 17: Thu, 5 Nov 2026 06:00_____ °C (+64 h)
Reading 18: Thu, 5 Nov 2026 10:00_____ °C (+68 h)
Reading 19: Thu, 5 Nov 2026 14:00_____ °C (+72 h)
Reading 20: Fri, 6 Nov 2026 02:00_____ °C (+84 h)
Reading 21: Fri, 6 Nov 2026 14:00_____ °C (+96 h)
Reading 22: Sat, 7 Nov 2026 02:00_____ °C (+108 h)
Reading 23: Sat, 7 Nov 2026 14:00_____ °C (+120 h)
Reading 24: Sun, 8 Nov 2026 02:00_____ °C (+132 h)
Reading 25: Sun, 8 Nov 2026 14:00_____ °C (+144 h)
Reading 26: Mon, 9 Nov 2026 02:00_____ °C (+156 h)
Reading 27: Mon, 9 Nov 2026 14:00_____ °C (+168 h)
Price This optional: add your own prices

Your prices are remembered on this device only.

Send Order WhatsApp, SMS or email to your supplier
Include
Working
  1. Least section 250 mm → ACI 306 minimum concrete temperature 13 °C
  2. Read every 4 h for the first 72 h (when heat of hydration peaks), then every 12 h
  3. Print this page for the site log; record surface and core readings separately for thick sections

Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.

How the Log Is Built

Readings      every [early interval] h for the first 72 h, then every [later interval] h
Minimum       ACI 306 temperature for the least section dimension
Mass concrete sections ≥ 0.9 m: max 70 °C, core–surface difference ≤ 19 °C

Worked Example

250 mm slab, finished 14:00 Monday 2 November 2026, every 4 h for 72 h then every 12 h, for 7 days:

  1. 27 readings: 14:00, 18:00, 22:00, 02:00, 06:00 … then twice a day
  2. Keep the concrete at or above 13 °C (ACI 306, section under 300 mm)
  3. Print the page and fill in each reading on site

ACI 306 Minimum Concrete Temperature

Least section dimension Minimum temperature
Under 300 mm (12 in) 13 °C (55 °F)
300–900 mm (12–36 in) 10 °C (50 °F)
0.9–1.8 m (36–72 in) 7 °C (45 °F)
Over 1.8 m (72 in) 5 °C (40 °F)

Frequently Asked Questions

How often should concrete temperature be recorded?

Commonly every 2–6 hours for the first 3 days and then every 12–24 hours until protection ends, more often in cold weather or for thick sections.

What is the minimum temperature for curing concrete?

ACI 306 recommends keeping concrete at or above 13 °C (55 °F) for sections under 300 mm, 10 °C (50 °F) for 300–900 mm, 7 °C (45 °F) for 0.9–1.8 m, and 5 °C (40 °F) above that, during the protection period.

What are the temperature limits for mass concrete?

ACI 301 limits the maximum concrete temperature to 70 °C (158 °F) and the difference between the core and the surface to 19 °C (35 °F), unless the specification sets other values.

References

  • ACI 306R: Guide to Cold Weather Concreting (minimum concrete temperature by section size)
  • ACI 305R hot weather; ACI 301 mass concrete limits (max 70 °C / 158 °F, differential 19 °C / 35 °F)
All Concrete Curing & Pour Planning Calculators